欧美老妇与禽交,97国产精华最好的产品亚洲,日本亚洲成高清一区二区三区,色偷偷女人的天堂亚洲网,日韩大片免费观看视频播放,女人脱裤子让男生桶爽免费看 ,亚洲精品国产精品精,国色精品卡一卡2卡3卡4卡在线
歡迎訪問沁陽市晨光實業有限公司官方網站!

沁陽市晨光實業有限公司

行業新聞

秉持著堅持品質、責任、精心、執著的理念,致力成為您滿意的合作伙伴,為客戶提供完善的產品和服務。

位置:首頁 > 行業新聞

玻璃鋼防腐管道安裝要求
時間:2022-07-05  瀏覽:5228次

  Requirements for installation of FRP pipes

  1、玻璃鋼防腐管道在安裝前應對設備管口、預埋件、預留孔洞、鋼結構等涉及管道安裝的內容進行復核。

  1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

  2、管道的坡度應按圖紙的要求進行調整,調整方法可以利用支座達到坡度要求,焊縫應設置在便于檢修、觀察的地方。

  2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

  3、與傳動設備連接的管道,安裝前內部要處理干凈,焊接固定管口一般應遠離設備,以避免焊接產生應力對傳動設備安裝精度的影響。

  3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

  4、管道與機器連接前,應防止強力相對,在自由狀態下檢查法蘭的平行度和同軸度。

  4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

  5、安全閥應垂直安裝,在投入試運行時,要及時調校安全閥。安全閥的調校在系統上進行,開啟和回座壓力要符合設計文件的規定。

  5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

  6、閥門安裝前,按設計文件核對其型號,并按介質流向確定其安裝方向。當閥門與管道以法蘭或螺紋方式連接時,閥門應在關閉狀態下安裝;如以焊接方式安裝時,閥門不得關閉。

  6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

  7、儀表元件的臨時替代:所有儀表元件安裝時,均采用臨時元件替代,等試壓、沖洗、吹掃工作結束后,投料前再正式安裝。

  7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


主站蜘蛛池模板: 熟女中文网站| 欧美久久久| 丝袜熟女露出| 日韩av无码一区二区三区无码| 情人伊人久久综合亚洲| 苍井空张开腿实干12次| 中文字幕一区在线观看视频| 国产色无码精品视频免费| 亚洲爆乳无码精品aaa片蜜桃| 天天做天天爱天天综合网| 精品无码久久久久国产| 久久18| 女的被弄到高潮娇喘喷水视频| 易门县| 人妻少妇精品久久久久久0000| 182tv国产片成人免费观看| 日本乱人伦在线观看| 黄色免费网站| 色偷偷www8888| 日本乱人伦在线观看| 亚洲AV在线观看| 亚洲一二区三区| www国产精品内射| 亚洲狠狠爱| 自拍偷拍日韩| 国语做受对白xxxxx在线| jiZZjiZZ欧美69| 中文字av| 97久久精品无码一区二区| jizz国产| 中文字幕日本最新乱码视频| 国产成人精品亚洲一区| 91岛国| 自拍偷拍日韩| 轻点好疼好大好爽视频| 人人操操| 久久99精品九九九久久婷婷| 午夜成人激情视频| 国外亚洲成av人片在线观看| 中文精品一区二区三区四区| 99中文精品7|